GAS INSTALLATIONS
Gas installations and high-pressure piping
We carry out the construction of gas installations and high-pressure piping systems and the installation of equipment in industrial and infrastructure projects. Our services cover the entire process — from material procurement and pipe manufacturing to installation, testing and commissioning of systems.
Working together with partners, we assist with process engineering and the selection and procurement of suitable equipment and components, ensuring the technical suitability of solutions and compliance with applicable standards and pressure equipment directives.
Gas infrastructure and high-pressure gas systems
- Biogas plants and pumping stations
- Construction of CNG filling station compressed gas infrastructure
- LNG vaporisation stations
- PRS stations (pressure reduction and regulation stations)
- High-pressure piping, including underground
QUALITY
Testing and quality control
All installations undergo the required quality and safety tests before commissioning. Inspection of welds and pipe joints, tightness and pressure testing are carried out in accordance with applicable requirements.
Upon handover, project documentation is provided that includes, in addition to test protocols, material certificates and documents certifying welders’ qualifications.
Certificate
EN ISO 3834-3
Our welding quality management system is certified to an international standard.
PROCESS
How we work
Analysis and engineering
We review the brief and, where needed, assist with engineering and equipment selection, ensuring the solution meets applicable standards and requirements.
Manufacturing and assembly
We procure equipment and materials and manufacture piping and components in accordance with the project, ensuring quality and technical suitability.
Installation and construction
We carry out the installation of gas systems and high-pressure piping on site, strictly adhering to safety and quality requirements.
Testing and commissioning
We carry out pressure and leak tests, and hand over the system together with the required documentation, ensuring safe and reliable operation.